DMG

Manufacturing building for dental materials with a warehouse area, a commissioning area, an office area and a social area

Client

MTG Mühlbauer Technology GmbH
Elbgaustraße 248
22547 Hamburg

Place of Construction

22547 Hamburg
Elbgaustraße 254

Plot

Area approx. 11,500 m²

Surface Areas

Surface Area 6,528 m²
Production and Logistic Area 5,723 m²
Offices and Staff Rooms 615 m²
Technical Rooms 190 m²
Newly Created Outdoor Facilities 1,500 m²

Building Height / Storeys

Building Height 10.60 m
Storeys 3

Project due dates

General Contractor Order November 2013
Start of Construction November 2013
Construction Completion October 2014

Highlights

A statically elaborate extension and addition of another storey were implemented with in-situ concrete, based on an existing and vacant building from the sixties. The new built basement was executed as a white trough. The restoration of the existing basement was performed with sealing measures from the outside and with the appropriate restoration concept for the inside. A high-quality siding facade was applied as a special outside design feature. The technical appliances on the rooftop can be accessed via an engineering stage with an area of 270 m². Two freight elevators act as through loaders and allow the exchange of materials between the storeys. The high purity requirements are met with an epoxy resin coating of 5,000 m². An infiltration ditch with a storage volume of roughly 175 m³ operates as rainwater retention.